![]() |
Map of Sultan Sewer System (includes insufficient slopes), 172 kb file I & I REPORT (Dated August 1990 by HDR, based on 11/89 flow measurements) Stormwater Quality Issues (& creation of stormwater utility) COUNTY CODES Re Sewer/Septic for development outside sewered areas (in Word, Acrobat) "Dancing Manhole Cover" Incident |
|
SEWER
AND WASTEWATER INFORMATION
|
|
|
GENERAL:
I & I Information, Studies and Reports: |
|
|
1993-96 SEWER/WASTEWATER TREATMENT PLAN (1993-96):
MAP OF THE SULTAN SEWER SYSTEM (includes insufficient slopes), 172 kb file
|
|
|
(I & I means "Inflow and Infiltration" the presence of unwanted excess water flowing into the sewer system which negatively affects sewer capacity; i.e., simplified this means more water and processing time and functions, and less sewage. More info):
SEWERS: How long has the City been aware they've had a serious I&I operational problem? ("I & I" is the undesirable Inflow and Infiltration of water into the Sultan sewer system.) The City has been well aware of the problem since before the highly-detailed August, 1990 engineering report performed by HDR. Here's an excerpt: "Inflow has disrupted the operations of the sanitary sewer system. During each of the heavy rainfalls, the sudden increase of flow and sediment from the inflow caused the lift station to shut down. This backs up all flows in Areas A through G...the manholes used in the monitoring program...filled to capacity. Inflow should not affect a sanitary sewer system to this degree. Rehabilitation efforts should emphasize the reduction of the inflow." (We refer folks to the Dancing Manhole Cover page; i.e., "BrownTrout" info, for a specific example.) Has the City addressed this subject, as Mayor Rowe indicated during the April 23rd North Wagley Creek Waterline Workshop? (also see our "sewer" page) |
|
|
BACKWASH LINE TEMPORARY BYPASS (Buno Construction, October, 2002 contract) Complete Contract (588 mb), or open smaller sections of the contract that appear below: |
|
| {page updated October 9, 2005) |